This is the view of contractor Grupo Unidos por el Canal (GUPC), which is building the third set of locks as part of the canal's expansion.

Water was found to be leaking from the concrete sill between the lower and middle chamber of the Pacific locks.

ACP said the "localised" seepage was the result of "insufficient steel reinforcement in the area which was subjected to stress from extreme condition testing."